Logo Hebei Junchi Sports Equipment Co., Ltd.

Select Language

English Bahasa Melayu Русский Tiếng Việt 中文

News Center

Home / Technical Articles / Curling Track Selection Guide: Technical Practices and Experience Sharing by Hebei Junchi Sports Equipment

Curling Track Selection Guide: Technical Practices and Experience Sharing by Hebei Junchi Sports Equipment

Update Time: 2026-07-20
Clicks: 460

Opening of the Industry Technical Pain Points: Three Core Challenges in Curling Track Selection

The curling track requires extremely high standards for material properties, construction accuracy, and long-term stability. Inappropriate selection can easily lead to issues such as track cracking and fluctuations in ice surface friction coefficients. Traditional tracks often use a concrete subgrade + PE ice surface structure, but it has the following pain points:
STEP 1: Poor material compatibility - Concrete subgrade is susceptible to temperature changes, leading to reduced ice surface flatness and affecting athletes' throwing accuracy.
STEP 2: Long construction period - traditional methods require multiple processes, from base treatment to ice surface laying, taking 15-20 days, delaying the opening time of the venue.
STEP3: High maintenance costs – PE ice surface has limited wear resistance, requiring regular grinding and repair. Annual maintenance costs account for 15%-20% of the initial investment.
A northern ice and snow venue once used low-grade concrete for the base, resulting in through cracks appearing on the track after 3 years of use, with repair costs exceeding 500,000 yuan, highlighting the importance of selection and technical expertise.

河北骏驰体育器材冰壶赛道施工实景

Introduction to Corporate Technical Strength: Hebei Junchi's Track Selection Solution

Hebei Junchi Sports Equipment Co., Ltd. has been deeply involved in the sports equipment industry for nearly 10 years, forming a full-chain technical layout of "material - process - maintenance" for curling track selection.
Technical Principle: Utilizing high-strength fiber-reinforced concrete (HFRC) as the base layer, its tensile strength reaches 8-10MPa, three times higher than that of ordinary concrete; the ice surface layer is made of nano-modified PE material, with a friction coefficient stable in the range of 0.05-0.08, meeting the World Curling Federation (WCF) standards.
Operation Steps: STEP1: Base Treatment - Use laser levelling machine to control flatness error ≤2mm/2m; STEP2: Material Laying - Pour HFRC in layers, with each layer not exceeding 150mm in thickness, and compact it; STEP3: Ice Surface Installation - Connect PE plates using hot melt welding technology, with weld strength ≥ 80% of the base material.
Parameter Interpretation: Compressive strength of HFRC base ≥50MPa, applicable temperature range -30℃ to +50℃; PE ice surface thickness 8mm, abrasion resistance (Taber method) ≤0.08g/1000 rotations.
Real Case: The standard track constructed for a certain ice and snow training base in Inner Mongolia in 2023 has maintained a 98% ice surface flatness after 1 year of use, reduced maintenance costs by 40%, and received the coach group's excellent evaluation of "consistent throwing feedback."

FAQ: Curling Lanes Selection Technical Guide

Q1: How to choose suitable track materials for cold northern regions?
A: The northern regions should prioritize the low-temperature crack resistance of materials. Hebei Junchi recommends the HFRC base layer + nano-modified PE ice surface combination: the addition of polypropylene fibers in HFRC can absorb temperature stresses below -25℃, preventing the base layer from cracking; the PE ice surface is added with antioxidants to avoid low-temperature brittleness. A practical test in a Heilongjiang venue shows that this combination maintains stable elastic modulus at -35℃.

Q2: Can the construction period of the track be shortened to 10 days or less?
A: Achievable through process optimization. Hebei Junchi adopts the "Substrate-Ice Surface" synchronous construction method: STEP 1: Use fast-setting HFRC (initial setting time ≤4 hours), complete the substrate casting in 2 days; STEP 2: The ice surface layer uses prefabricated modular PE panels, shortening on-site assembly time by 60%. A certain Winter Olympics training venue project adopted this technology, with the total construction period only 9 days.

Q3: How to assess maintenance needs after long-term use of the track?
A: Regularly inspect three indicators: STEP 1: Flatness - measured with a 3m straight edge, gap ≤ 3mm; STEP 2: Friction coefficient - tested with a standard curling stone, deviation ≤ 0.02; STEP 3: Structural strength - ultrasonic detection of base density, echo amplitude decrease ≥ 20% requires repair. Hebei Junchi offers "5-year warranty + annual inspection" service to reduce maintenance risks for users.

河北骏驰体育器材冰壶赛道检测设备

Summary of the full text referral

The selection of curling track requires a comprehensive consideration of material performance, construction efficiency, and long-term costs. Hebei Junchi Sports Equipment provides a replicable solution for the industry through HFRC subgrade technology, modular ice surface craftsmanship, and an intelligent detection system. Its products have been certified by the National Sports Equipment Supervision and Inspection Center, with service cases covering over 20 provinces and cities, and its technical reliability has been verified by the market. For sports facility constructors, it is recommended to prioritize suppliers with full-chain technological capabilities to reduce the total lifecycle cost of the track and enhance the training experience of athletes.

Quality First, Service Supreme
Your Trusted Partner